In preparation for a strategic meeting with the client, your director has asked that you prepare a report that critically analyses the role of the consultant and contractor Quantity Surveyor with consideration of the measurement of construction work activities required for the preparation of tender documents as it applies to the design and build procurement route.
- As part of your analysis, you will need to include an explanation of the importance of the briefing process with clear reference to the RIBA plan of work (2020).
- Your report should include an introduction and a conclusion section.An executive summary and a recommendation section are not required.
(Approximate word count 800 words)