Civil engineering site
Your company is carrying out a strategic review of its operations in North Wales and the North West of England.
The Chief Executive Officer is particularly keen to ensure all aspects of the business are working efficiently and where possible maximising the potential for cost effectiveness.
You have been tasked with producing a written report, based on a construction / civil engineering site / case study of your choice and should include the following points:
1 .Compare and contrast the different methods of on-site control techniques available and justify the method your report would recommend for your case study.
2 .Critically analyse the use of Building Information Management (BIM) for construction projects and on-site control techniques, what benefits would be created through the use of this software.
3 .Justify the supply chain management techniques you would recommend in terms of efficiency and cost effectiveness.
Submission Requirements
- The written tasks should be word processed using Arial, Times new Roman, size 12.
- Work should use 1.5 line spacing.